Noticias

UKO screed-covered duct compared with screed-flush duct systems on a purple and grey background.

Comparison of UKO screed-covered duct and screed-flush duct systems.

How to choose between a screed-covered underfloor duct and a screed-flush duct for offices

Compare screed-covered and removable-cover screed-flush ducts for offices. Check access, floor depth, finishes and future changes before choosing.

What to consider before choosing electrical cable management for an office

When planning power and data distribution beneath an office floor, start with the space and how it will be used. What the finished floor will be like, where the connections will go and how much access to the cabling you will need over time are more useful questions than choosing a duct from a photograph or a single dimension.

A screed-covered underfloor duct and a removable-cover duct installed flush with the finished floor can both distribute services beneath a walkable surface. The difference lies in how you access them. In the first arrangement, the main duct run sits below the floor finish, with access through the planned floor boxes and service units. In the second, the covers sit level with the finished floor and make the duct accessible along its route.

That difference affects the architectural design, the construction work and later alterations. Cable capacity and mechanical strength depend on the specific product and its configuration, so neither solution is the best choice for every office. We look at the criteria we use with project teams to make this decision.

The two systems we are comparing

A screed-covered underfloor duct

In this arrangement, the ducts are placed on the structural slab and covered by the layers of the floor. Compatible boxes and service units provide the connection and access points defined in the design. Between those points, the floor can retain a visually continuous finish. This is worth considering when the interior design calls for the main route to remain out of sight.

Concealing the duct makes careful route planning essential. You need to check the available floor depth, position the boxes and allow both for the initial cabling and a reasonable spare capacity. Once the floor has been completed, changing the main route does not offer the same level of access as opening the covers of a flush-mounted duct.

This does not mean that a screed-covered installation cannot be expanded. Its scope for change depends on the available cross-section, the accessible points and what was allowed for during design. In our experience of cable management projects, useful flexibility comes from decisions made before the floor is closed. Leaving spare space without considering where future connections may be needed can prove insufficient.

Our UKO range of screed-covered underfloor ducts illustrates this arrangement. It lets us plan the distribution of power and data together with the floor boxes. The UKO animation on our YouTube channel helps you see the components and installation sequence. Work on site must follow the instructions for the selected product.

A removable-cover duct flush with the floor

A screed-flush duct is installed so that the tops of its covers are level with the finished floor. Removing those covers in accordance with the system instructions gives access to the duct along its route. This access throughout the run can be decisive when alterations are expected at different points.

The covers also become part of the visible floor. Their position, size and junction with the floor finish must be resolved as part of the interior design. These decisions should not be left until the end of the construction work. You also need to check the expected loads, the cleaning method and the installation depth required by the chosen system.

“Flush with the floor” describes the final position of the covers. It does not mean that the duct can be installed without considering the floor layers, levelling or finish. A construction section usually makes this clearer than a product description.

Our UEBS removable-cover screed-flush duct is one example for horizontal cable routing in spaces such as offices. The UEBS installation animation shows how the duct sections, profiles, levelling and covers fit together. The video helps explain the system, while the product data and installation instructions allow you to check whether it suits a particular project.

A comparison based on project requirements

Criterion

Screed-covered duct

Removable-cover screed-flush duct

What to check

Access to the route

Access is arranged through the planned service points.

Covers allow access to the duct along the route.

Where and how often work will be needed.

Appearance of the floor

The main duct run remains hidden beneath the finish.

The line of covers is integrated into the visible floor.

Interior design requirements and junctions with the finish.

Future changes

These depend on spare capacity, the route and the position of the boxes.

Access to the duct can make work on different sections easier.

Possible layout changes and the expansion strategy.

Floor build-up

Duct height and screed cover must be coordinated with the floor.

The duct must be levelled with the finished floor and have sufficient installation depth.

Actual levels between the slab and the final finish.

Cabling

Capacity depends on dimensions, compartments and planned occupancy.

It also depends on usable cross-section, dividers and permitted occupancy.

Cable numbers and types, segregation and calculated spare capacity.

Use and maintenance

Boxes and service units must suit traffic and cleaning conditions.

Covers, profiles and joints must suit the way the floor is used.

Loads, cleaning and conditions in the space.

Cost

Assess the complete system, construction work and possible later interventions.

Assess the complete system, covers, integration and maintenance.

Comparable budgets for the same project and period of use.

This table helps structure the discussion, but it does not name an overall winner. Load figures in different product data sheets may come from different test conditions. Likewise, a maximum number of cables means little without their diameters, the duct cross-section and the chosen configuration.

For that reason, we do not turn general figures appearing in some search answers into design rules. The comparison must be between specific products under equivalent conditions of use.

Access to cabling and the frequency of change

The first question is what is likely to change. An office with a settled layout has different needs from a floor where workstations, equipment and meeting rooms are reorganised regularly.

If the expected work will focus on service points already defined in the design, a covered system may work well provided that enough spare capacity has been allowed. When the main duct run needs to be accessed at different positions, the ability to open its covers becomes a more important factor.

It is also worth separating two needs that are often confused. Adding cables is not the same as moving an outlet. Spare space inside a duct may allow certain extensions, but it does not by itself provide a new connection point elsewhere. To assess real flexibility, we look at the route, compartments, boxes and branches.

Available depth and the floor finish

The relevant measurement is the distance from the structural slab to the finished floor level, including every layer. In a refurbishment, that depth may be limited by doors, entrances, junctions with other rooms or existing services. A new building usually gives more room to coordinate the elements from the design stage, but their dimensions still need to be checked.

Comparing the nominal heights of two ducts is not enough. In a covered system, the screed cover and final finish matter. In a flush system, the levelling range, profiles and final position of the cover matter too. Drawing a section with the actual levels helps prevent the choice of a product that later forces a change to the architectural design.

The specified finish also affects the choice. Carpet, modular flooring and ceramic tiles create different junctions and maintenance requirements. If the finish has not yet been selected, it is better to keep the system choice open until its integration can be checked.

Connection points and the working office

Before fixing the route, map the current workstations, shared areas and equipment, along with the most likely future layouts. Then place the power and data connections and work out how they will be fed from the main run. This often shows whether more boxes, another branch or a different route is needed.

Consider how the installation will be accessed while the building is occupied. A removable cover may make work on a particular section easier, but opening it has to be coordinated with activity in the space and the relevant safety measures. In a covered system, the planned access points and boxes are essential to the maintenance strategy.

Our advanced guide to underfloor systems covers the broader planning issues and applications. Here we take that planning a step further by using it to choose between a covered and an accessible duct run.

Cable capacity and spare room for growth

The outside width of a duct does not tell you how many cables it can hold. To size it, we need to know the intended services, cable dimensions, required separation and allowance for later additions.

When power and data share an infrastructure, we also need to consider how the compartments are arranged. The right configuration depends on the project and the applicable technical requirements. “High capacity” says little to a specifier unless it is tied to a usable cross-section and a verifiable occupancy.

In our experience, it is more useful to ask what expansion is expected and where it will take place. We can then assess whether the available spare capacity and access points will support a real change, rather than setting aside an undefined margin that may be in the wrong place.

How the type of space changes the priorities

A new office with a defined layout

In a newly built office with clearly located workstations and services, the visual continuity of the floor may carry more weight. If the route and connection points can be set out from the start, a screed-covered duct is worth considering.

The decision is stronger when the design allows for a reasonable future occupancy. Ask the client what changes they expect over the coming years. More people may join, meeting rooms may change or equipment may bring different connection needs. The answers help refine the route, the box positions and the spare capacity.

Avoid treating the first layout as permanent. A “defined” arrangement may only describe how the office will be used in its first year. Planning for growth is not simply a matter of hiding more cables. It means providing an infrastructure that can serve foreseeable changes.

An office refurbishment or frequent layout changes

In a refurbishment, the existing floor constrains the work. Check the levels, door junctions, the finish that will remain and the areas where intervention is possible. If frequent layout changes are also expected, access through removable covers may bring an operational advantage.

That advantage must be tested against the actual building. The installation depth, cover positions and integration must fit the available floor build-up. A site visit and a construction section usually tell us more than a generic list of benefits.

If the office will remain occupied during the works, the installation sequence matters too. The chosen system must be coordinated with the areas that can be worked on and the interruptions the occupants can accept.

A shop or exhibition space

A shop layout may change with campaigns, new equipment or revised display areas. That is a reason to study an accessible duct, but it does not settle the choice by itself.

Check where the counters will go, how people will move through the space and what finish the floor will have. Some areas may need access along the route. In others, planned service points may be enough. The project may call for a different arrangement from the one we would choose for a conventional office.

Pay particular attention to the loads on each section, the floor-cleaning method and the changes that are genuinely expected. The documented conditions for the selected product must support the solution before it is included in the electrical and architectural design.

What our TU Berlin Institute of Mathematics project shows

On one of the PohlCon Group's projects, the TU Berlin Institute of Mathematics, we supplied and installed 570 metres of a project-specific screed-flush duct system designed for heavy loads, together with integrated floor boxes. We also supplied cable support systems for other routes within the building.

This project lets us show how a flush duct can form part of a wider infrastructure coordinated with the other services and the floor finish. Photographs of the open duct and the completed floor show two stages worth examining together. The first shows the space and components needed for the route. The second helps explain how the system meets the finished floor.

The project also reinforces the importance of not applying the performance of a special design to a standard product. The Berlin system was developed for the requirements of that building. We do not present it as UKO or as standard UEBS, and its load conditions cannot be used to promise the same result with another product.

When looking at the images, notice the junctions between the duct and the floor and the position of the boxes. These details help you ask better questions of the technical team. A photograph of the finished floor alone cannot explain the decisions behind the installation.

Where our UKO and UEBS systems fit

We recommend considering UKO when the project calls for a screed-covered underfloor duct and allows the route and service points to be coordinated from the outset. Its compartment options help organise services and allow spare capacity, within the dimensions and conditions of the selected product. Our dedicated article provides more detail on its components and applications.

We suggest assessing UEBS when access along the route and the integration of a removable-cover duct flush with the floor better suit the intended use. Our product page shows the covers, profiles, levelling components and available variants. Before selecting one, we check that it suits the loads, finish and maintenance conditions of the space.

Our UKO and UEBS videos show how both systems are arranged. They help you understand the installation sequence and prepare a technical discussion. The product data, instructions and installation design provide the remaining detail.

Questions to ask before choosing

Can electrical wiring be routed through the floor?

Yes. Cable management systems are designed to distribute electrical services beneath the floor or flush with its surface. Their selection and installation must follow the project design and the applicable provisions of Spain's Low Voltage Electrotechnical Regulation.

UNE-EN 50085-2-2:2009 sets out particular requirements for cable trunking and ducting systems intended to be mounted underfloor, flush with the floor or on the floor. Its application must be considered alongside the other technical conditions of the installation.

In an office, the question is not whether routing cables through the floor is generally discouraged. You need to determine which system meets the conditions of the space, protects the services and gives access to them as planned. A solution intended for a home should not automatically become the design criterion for an office building.

Does a screed-covered duct prevent future cabling extensions?

Not necessarily. The possibility of expansion depends on the spare capacity, planned access points and the characteristics of the duct and its components. It also depends on the proposed change. Adding cables to a prepared route is different from moving an outlet to an area that was never planned as a service point.

Before specifying the system, describe the most likely changes and mark on the drawings where intervention would be needed. This lets you check whether the proposed arrangement provides adequate access and room.

Does a screed-flush duct always hold more cables?

No. Capacity depends on the product variant, usable cross-section, dividers, cable types and applicable occupancy criteria. A flush duct may be suitable for a project with many services, but no universal cable count applies to every model.

Ask for the selected configuration to be sized and check the planned spare capacity. The comparison is only useful if both options are assessed against the same services and conditions of use.

What information do we need to recommend a system?

To guide the choice, we need a section through the floor with its levels, the final finish, a layout drawing and the planned connection points. The services and cables, expected loads, cleaning method, possible layout changes and construction constraints are also helpful.

With this information we can select the products worth studying and consult the right technical documents for each. A recommendation made without knowing the floor build-up or future use of the space would be too general.

Take the comparison to the drawing

The choice is well founded when you can explain why the system fits the project. Define how the space will be used and how it may change. Then check the floor build-up, locate the connections and size the route. Finally, compare the products that meet those conditions and review how they will be installed and maintained in the future.

Send us the drawing, the available floor depth, the type of finish and the planned outlet positions. We will review with you whether a screed-covered duct, a removable-cover screed-flush duct or another underfloor arrangement is worth studying for your project.

If you would like us to study your project and support you from the initial planning to its completion, write to us through our contact page.

Contact us

Just give us a call or write to us - we look forward to it!

Consultant Search
Memolist
No items in memolist
inclusive accessoires